Shuttle Mir Program Patch Baseball T-Shirts
Description: Celebrate the legacy of the historic Space Shuttle Program with this official final program patch design selected out of nearly 100 designs by NASA to represent the end of the Space Shuttle Program in 2011. Designed by NASA Art Director and Graphic Designer Blake Dumesnil. This non-distressed version offers the end of program patch on the back with a retro Shuttle and NASA Worm Logo design on the front breast. **Check out the other awesome pop culture designs on my storefront!**
Description: The John F. Kennedy Space Center (KSC, originally known as the NASA Launch Operations Center) is one of ten National Aeronautics and Space Administration field centers. Since December 1968, Kennedy Space Center has been NASA's primary launch center of human spaceflight. Launch operations for the Apollo, Skylab and Space Shuttle programs were carried out from Kennedy Space Center Launch Complex 39 and managed by KSC.[2] Located on the east coast of Florida, KSC is adjacent to Cape Canaveral Air Force Station (CCAFS). The management of the two entities work very closely together, share resources, and even own facilities on each other's property. (Source : Wikipedia)
Description: STS-134 (ISS assembly flight ULF6)[9] was the penultimate mission of NASA's Space Shuttle program and the 25th and last spaceflight of Space Shuttle Endeavour.[10] This flight delivered the Alpha Magnetic Spectrometer and an ExPRESS Logistics Carrier to the International Space Station.[11] Mark Kelly served as the mission commander. STS-134 was expected to be the final space shuttle mission if STS-135 did not receive funding from Congress. However, in February 2011, NASA stated that STS-135 would fly "regardless" of the funding situation.[12][13] STS-135, flown by Atlantis, took advantage of the processing for STS-335, the Launch On Need mission that would have been necessary if the STS-134 crew became stranded in orbit.